There was supposedly a sewer connection to the lot. We couldn't find it, and so a new line was installed from septic tank down the road and then a connection to the property.
The wall between the properties was started. The footings were done in a day. Very hard work. All the rock was moved by hand, as seen in this photo and the cement was mixed in an old fashioned mixer and hauled by wheelbarrow to the men in the trenches.
Adding water to get the right mix.
Footings being cemented.
Sandals being worn. No regulations for attire.
Pretty straight forms without any levels, and these footings are for the wall. Imagine what they will be for the house!
Rebar being formed to anchor the column.